What are the Input and Output of RF Optimization?


Before starting RF optimization, prepare engineering parameter table, cell parameter table (name, latitude and longitude, PN , height, azimuth etc)
site survey report, network planning report, and  if you are going to  verify single site then prepare  single site verification checklist.

After completing RF optimization, corresponding engineering parameter table, cell
Parameter table are written and their corresponding changes are recorded.

Before starting the RF optimization, the following documents should be prepared:

  •           Engineering parameter table
  •          Cell parameter table
  •          Site survey report
  •          Radio network planning report
  •          Single site verification checking table



In the RF optimization phase, the following documents are to be put out:


Updated engineering parameter table and updated engineering parameter change record
Updated cell parameter table and updated cell parameter modification record


After the parameter modification, if the indexes collected by the DT meet the requirement for
RF KPI indexes, the RF optimization completes. The next phase is service optimization.