Before starting RF optimization, prepare
engineering parameter table, cell parameter table (name, latitude and longitude,
PN , height, azimuth etc)
site survey report, network planning report,
and if you are going to verify single site then prepare single site verification checklist.
After completing RF optimization, corresponding
engineering parameter table, cell
Parameter table are written and their
corresponding changes are recorded.
Before starting the RF optimization, the
following documents should be prepared:
- Engineering parameter table
- Cell parameter table
- Site survey report
- Radio network planning report
- Single site verification checking table
In the RF optimization phase, the following
documents are to be put out:
Updated engineering parameter table and
updated engineering parameter change record
Updated cell parameter table and updated cell
parameter modification record
After the parameter modification, if the
indexes collected by the DT meet the requirement for
RF KPI indexes, the RF optimization
completes. The next phase is service optimization.